27555ISO 27555 Revision CheckerEdition 2 draft · stage 40.60

Home / Kit and watch / Specimen

Specimen · not the delivered file

ISO 27555 kit specimen

One labelled register row and one plan row, so you can see the shape of the kit before you buy. The delivered file has 55 register rows, the worksheets, the change map, the plan, the board brief and the source note.

Register row, specimen

Specimen row. The delivered register carries all 55 rows.
FieldValue
Clause5.4.2 Regular deletion period
CitationISO/IEC DIS 27555, Clause 5.4.2
Evidence levelPublic text held
Requirement, our wordsThe outer limit for a cluster is its retention period plus the maximum acceptable time for the deletion process. The process time is estimated and written down, not assumed to be zero.
Evidence artifactThe period specification sheet for the cluster, with the process time estimate and its approver
OwnerCluster owner (to be named)
StatusTo be assessed
Due dateA date you set against the planning date

Plan row, specimen

Specimen plan row. The delivered plan carries the dated checkpoints.
WhenStepClauseDone when
NowName the framework owner and write the scope note1, 10A signed scope note and a named owner

This is a specimen. It is labelled as such, it is not the delivered file, and it does not carry the full register. The free clause pages carry the same evidence level on every clause.

Buy the kit, USD 799